This proposal seeks validator and community approval to update the terrad client to v2.4.2 (upgrade name v7). The chain will be halted at block height 17309000 which will approximately be processed on 25th of March 2024 14:00 UTC. Upon passing of this proposal, an automatic chain halt will be scheduled at the specified height. The validators are going to be asked to install the new version of the terrad client after the chain halt occured. Please find full proposal snapshot and proposal discussion at the following locations:\nhttps://github.com/classic-terra/documents/blob/main/proposals/v7-proposal.md\nhttps://commonwealth.im/terra-luna-classic-lunc/discussion/15503-upgrade-terra-classic-to-v242
Submitted
07 Mar 2024, 19:22:36 UTC
Vote closed
14 Mar 2024, 21:43:05 UTC
Activation height reached
The chain passed the scheduled height and reports application version 4.0.1-patch.3.
Current or final voting power, calculated from the on-chain tally.
Quorum
Reached
Plan
v7
Activation height
17,309,000
Current height
30,593,047
Reported app version
4.0.1-patch.3
Objective network measurements at vote close plus 7, 30, and 90 days. Missing history is shown honestly, never backfilled with estimates.
Average block time
Preferred signal: stable
7 days
A close-enough baseline and endpoint sample were not both available.
30 days
A close-enough baseline and endpoint sample were not both available.
90 days
A close-enough baseline and endpoint sample were not both available.
/cosmos.gov.v1.MsgExecLegacyContent/cosmos.upgrade.v1beta1.SoftwareUpgradeProposal77.80% participating
Approval
Passing
99.95% decisive Yes
Veto
Below threshold
0.00% of participation
What this message can change—not a prediction of price.
Transaction success rate
Preferred signal: up
7 days
A close-enough baseline and endpoint sample were not both available.
30 days
A close-enough baseline and endpoint sample were not both available.
90 days
A close-enough baseline and endpoint sample were not both available.
Active validator count
Preferred signal: stable
7 days
A close-enough baseline and endpoint sample were not both available.
30 days
A close-enough baseline and endpoint sample were not both available.
90 days
A close-enough baseline and endpoint sample were not both available.